Industrial Lifting and Material Handling Systems · Project-Specific Manufacturing

Home / Services / Installation and Commissioning

Service

Installation and Commissioning

A correctly manufactured crane won't work correctly if it's installed incorrectly.

Rail line first

A new crane inherits every flaw of the existing rail line. That's why the first step of installation is measuring the line: span, elevation difference, straightness and rail slope.

If the measurement result is outside tolerance, alignment is carried out. Skipping this step means wheel wear and tracking problems start within the first months on the new crane as well — and a warranty dispute follows.

Installation and connection

The crane is placed on the rail line using suitable lifting equipment; end carriages and the bridge are connected, and the trolley and hoist group are installed.

The power supply line (busbar or festoon cable) is then run, panel connections are made, and phase sequence and grounding are checked. Limit switches, the overload limiter and emergency stop are each tested and verified.

Commissioning steps

Handover itemWhy it matters
Operating and maintenance instructionsMaintenance intervals and correct use are written here
Rail line measurement reportReference for comparison in future measurements
Load test recordRequested during periodic inspection and audits
Electrical schematicSignificantly shortens fault diagnosis
Spare parts listIdentification and lead time of critical parts
Nameplate informationCapacity, serial number, year of manufacture, duty class

Technical terms

TermWhat it means
CommissioningThe adjustment, testing and handover process after installation.
Phase sequenceThe order of phases in a three-phase supply; if wrong, motion directions are reversed.
Function testVerifying one by one that the safety devices work.
Lockout–tagoutA method to prevent energy from being accidentally applied during maintenance.

Frequently asked questions

Does production stop during installation?

The area where the crane will be installed must be cleared. The duration varies with scope; the work is usually scheduled during a production shutdown or outside shift hours.

How long does operator training take?

It depends on the crane's equipment; it covers control use, safety rules, daily checks and emergency behavior.

What if my rail line is out of tolerance?

A measurement report is issued and an alignment quote is provided. If installation proceeds on an out-of-tolerance line, the limits of responsibility must be clarified in writing.

Get a quote for Installation and Commissioning.Just send us the dimensions and your duty cycle — Get a Quote.

Related pages

Manufacturing gallery

20-ton marine crane — delivery and installation
20-ton marine crane — delivery and installation
30-ton knuckle-boom truck crane — delivery
30-ton knuckle-boom truck crane — delivery
30-ton knuckle-boom truck crane — delivery
30-ton knuckle-boom truck crane — delivery
7-ton marine crane — delivery and installation
7-ton marine crane — delivery and installation
8-ton knuckle-boom truck crane — delivery
8-ton knuckle-boom truck crane — delivery
Marine crane — delivery and installation
Marine crane — delivery and installation

Send us your project's dimensions, let's prepare a quote

Write the span, tonnage and lifting height — our technical team will get back to you the same day.