Crane Systems for Energy and Petrochemical Plants

Cranes in power plants and petrochemical facilities: Ex-proof applications, maintenance cranes, and the need for high reliability despite low usage.

The Ex-proof requirement

In areas where flammable gas, vapour or dust may be present, the equipment used must not produce sparks. This is a holistic design issue that concerns not only the crane's motor but its panel, junction boxes, controls, lighting, and even the wheel and hook material.

An Ex-proof solution cannot be designed without knowing the area's zone classification and gas/dust group. This information is found in the facility's explosion protection document.

The risk of a rarely-used crane

Power plant maintenance cranes are used only a few times a year. Paradoxically, this makes maintenance more important, not less: brakes that stay still for long periods stick, grease hardens, contactors oxidise, and the rope picks up moisture at a single point.

For these cranes, the maintenance schedule is tied to the calendar, not to operating hours, with periodic no-load runs performed regularly.

Typical applications

ApplicationKey requirement
Explosive atmosphere zoneEx-proof (ATEX-scope) design, certified components
Turbine / generator maintenanceHigh lifting height, precise positioning
Boiler room maintenanceHeat-resistant components
Low usageCalendar-based maintenance, periodic no-load runs
Outdoor equipment maintenanceGantry or semi-gantry, outdoor-rated equipment
Critical downtimeSpare parts stock and fast service agreement

Frequently asked questions

Can a standard crane be converted to Ex-proof?

Generally no. Ex-proof requires certifying the entire design, not individual components. Converting an existing crane is often more expensive than a new one.

Who determines the zone classification?

It's defined in the facility's explosion protection document. Crane design follows the zone and group information in that document.

Get a quote for Energy and Petrochemical.Tell us the facility's dimensions and duty cycle — Get a Quote.

Other sectors

Send us your project's dimensions, let's prepare a quote

Write the span, tonnage and lifting height — our technical team will get back to you the same day.

Quote Form Message on WhatsApp